Polk Township Conditional Use Hearing 3 - January 23, 2024

3 months ago
98

A 90 Megawatt (MW) solar ‘farm’ is proposed to cover 486 acres approximately over two townships. Approximately 200 acres are located in Polk Township. The solar ‘farm’ proposed substation is expected to be 5-10 acres and will be located in Chestnut Hill Township.

On July 17, 2023, the first conditional use hearing was held for Polk Township. You can watch that replay here: https://rumble.com/v30w7eo-polk-township-conditional-use-hearing-july-17-2023.html

On September 27, 2023, the second conditional use hearing was held for Polk Township. You can watch that replay here: https://rumble.com/v3m2b61-polk-township-conditional-use-hearing-september-27-2023.html

On January 23, 2024, the third conditional use hearing was held for Polk Township.

Polk Township residents may get a copy of Effort Solar LLC’s Conditional Use Application by contacting the Township or via the public file dropbox: https://app.box.com/s/xhauq772c25pob9l08d05mu4z553820m

If you found this information helpful consider giving a donation. I spent a lot of time editing this video due to the very poor audio quality - the microphone were cutting in and out, and many residents did not have microphone access. All donations are greatly appreciated. Donations help me cover events like this one, equipment and transportation to events and ongoing expenses for live streaming (hotspot data plans, Rumble streaming fees etc).

Donate to support Gwyneth:
PayPal @GwynethFowler send as family/friend please
Venmo @gwynny7
CashApp $gwynny7

Loading comments...